Reinforced concrete ground structures
Pad and strip foundations
Raft foundations
Piled foundations
Retaining walls
Sheet pile walls
Enabling works
Drainage
Culverts
Bridges and abutments
Building services trenches
Services diversions
Liquid retaining structures
Highways
Footways
Coastal and flood defence
Builders work assessments
Reinforced concrete frames
Steel frames
Portal frames
Wind posts
Masonry
Timber
Glass
Stonework
Bridges
Viaducts
Arches
Barrel Vaults
Platforms
Access Stairs
Cladding support systems
Barriers, fencing and gates
Elevated walking routes and gantries
Power supply and distribution systems
Power and ancillary services
DNO connection and isolation
Lighting and control systems
Emergency lighting and control systems
Uninterrupted power supplies (UPS)
Off-line battery invertor systems (OLBI)
Transformer system design
Auxiliary generators
Lightning protection
Protection discrimination studies
Conceptual and feasibility studies
Sustainability assessments
Earth bonding design and assessment
Installation condition and compliance inspections
Testing and commissioning authentication
Cable management systems
Power load assessments and applications
Structural propping and bracing
Facade retention
Piling working platforms
Crane foundations
Earth retention
Excavation support
Slope stability
Basement shoring
Trench shoring
Manhole shoring
Party wall propping
Masonry restraint
Structural Needling
Scaffolding
Falsework
Formwork (proprietary and bespoke)
Asset protection
Highway safety barrier protection
Safe walking routes
Site hoardings, fences and gates
Access gantries
Site accommodation and foundations
Site power and lighting
Temporary Works Coordinator BS 5975 Services
Temporary Works Design Brief
Temporary Works Register compilation and management
Temporary Works Supervisor competency and nomination
Temporary Works Designer competency audits
Temporary Works Method Statement audits
Temporary Works Safe System of Work audits
Temporary Works design documentation audits
Temporary Works inspections
Permits to Load
Permits to Unload
Temporary Works monitoring systems and guidance
Desktop studies
Structural inspections and reports
Structural assessments
Bridge and abutment assessments
Existing asset safe load assessments
Containment supporting assessments
Builders work assessments
Core hole and penetrations assessments
Materials delivery access route safe load assessments
Cutting, drilling and fixing assessments
Category 1, 2 and 3 checks
Civil
Structural
Electrical
Temporary Works
Network Rail Form F001 Approval in Principle
Network Rail Form F002 Statement of Design Intent
Network Rail Form F003 Design and Check
Network Rail Form F005 Fitness to be Taken into Use
London Underground Cutting, Drilling and Fixing Logs
Approval In Principle Documentation (AIP)
Conceptual Design Statements (CDS)
Project Assurance Plans (PAP)
Design Compliance Reports (DCR)
Design Compliance Declarations (DCD)
Track Clearance Applications
Heritage buildings
Listed buildings
Stonework restraint and fixings
Masonry restraint and fixings
Cladding restraint and fixings
Tactile paving
Vitreous enamel panel support systems
Barriers and gates
Signage
Finishes
Line markings
Disability Discrimination Act (DDA) compliance
Cable route management systems
Cable containment
Invert containment
Catenary containment
Cable toughing
Cable ducts
Cable trays and basket
Cable trunking
Cable ladders
Under road crossings (URX)
Under track crossings (UTX)
Over track crossings (OTX)
Core holes and penetrations
Fire stopping
Earth bonding
Builders work holes
Core holes
Penetrations
Lintels
Structural ties and straps
Masonry wall ties and straps
Cladding support and fixings
Stonework fixings and restraint
Plinths
Handrails
Barriers
Cable pulling jigs
Equipment bases
Demolition and deconstruction design
Sequence and phasing drawings
Propping and bracing systems
Earthworks and landscape planning
Crash decks systems
Falsework systems
Access scaffolds
Asset protection
Plant, falsework and spoil loading assessments
Electrical isolation and protection