Ealing Common Piling Works

A planned two level piled basement immediately adjacent to operational Ealing Common Station required the design of a multi-tier piling working platform and associated plant access ramps. With piling cut off level 3m above the adjacent Ealing Common platforms, Deltaline designed the working platform and retaining structure capable of supporting piling rig operations within 3m horizontal metres of the station wall. All piles were installed without complication.

In addition Deltaliine provided designs for site small power/lighting and all perimeter hoardings.

To temporarily divert dirty water Deltaline also conceived and provided civil and electrical designs to facilitate installation of a waste water pump system.

Deltaline provided a fully qualified Temporary Works Coordinator to guide, monitor , record and approve site operations.