Cartier Building - Old Bond Street

To facilitate refurbishment of Cartier's Old Bond Street Building Deltaline were appointed to design and detail temporary works providing support to all floors during complete removal and replacement of a load bearing facade wall. Temporary works included five levels of independently adjustable propping providing both vertical support to floors and lateral support to party walls.

Other Deltaline works included the design of all internal steel work connections and temporary floor propping to enable the delivery routes of heavy fit-out equipment.

To safely progress works Deltaline provided a fully qualified Temporary Works Coordinator to guide and monitor site operations.

Deltaline prepared a full set of risk and construction documentation to programme which was approved by the Client for works to proceed on site as planned with no safety or reliability issues.