Harrods - Knightsbridge - Temporary and Permanent Works Design

As part of planned refurbishment of the menswear and electrical departments, Deltaline Design were appointed to design both temporary and permanent works to support five overhead floor levels of the Harrods building. Works were designed to be installed between and during operational hours with no disturbance to store customers.

As part of these works Deltaline provided a fully qualified Temporary Works Coordinator to guide and monitor site operations.

Deltaline prepared a full set of risk and construction documentation to programme which was approved by the Client for works to proceed on site as planned with no safety or reliability issues.