Off Line Battery Inverter System - Knightsbridge Underground Station

In support of London Underground 'Step Free Access' program Deltaline Design were appointed to provide electrical design services for a new Off Line Battery Inverter System (OLBI). The new system was located within the Brompton Road Ticket Hall with supplies distributed throughout Knightsbridge Station. Additional works included design of new 400 amp incoming service heads, switch gear, cables and cable route management system.

Deltaline Design engineers provided electrical, temporary works and civil engineering support to enable the assured installation of the system supported by a comprehensive pack of assurance documentation for the delivery installation and testing of the full OLBI system.

Deltaline Designs Assurance Documentation was approved by LU to programme and works started and progressed on site as planned.