Canada Water Fire Segregation Barrier

To enable East London Line upgrade works at Canada Water Station, Tube Lines Ltd and London Underground identified a requirement to segregate works from ongoing Jubilee Line passenger services. The Jubilee Line service was to remain fully operational as a Section 12 LU station during the works. Fire separation, smoke control, emergency routes, and access for asset maintenance were to be modified without compromise to achieve a fully compliant and safe system for the duration of the works.

Deltaline Engineers designed and obtained assurance for a scope and standard compliant segregation barrier system ensuring that Jubilee Line passengers were protected and isolated from the ELL works by a 100 m² one-hour fire rated protective hoarding. The hoarding was designed to resist impact and be capable of withstanding expected loads due to passing train pressure, potential passenger overcrowding and be sufficiently robust to endure the extended duration of use.

Deltaline prepared a full set of assurance and construction documentation which was approved bu LU to programme and works started on site as planned.

our projects